Jarelle123 Jarelle123
  • 02-07-2018
  • Mathematics
contestada

If a project will take 35 employees 2940 hours to complete how many hours will each employee have to work

Respuesta :

afrazi01p8qv5j
afrazi01p8qv5j afrazi01p8qv5j
  • 02-07-2018
To find out how many hours each employee will need to work, we divide 2940 hours by 35 to evenly split the hours among each of the workers.
2940 / 35 = 84
This means that each employee will need to put 84 hours of work into the project to complete it.

Answer Link

Otras preguntas

josh wanted to buy a bicycle but didn't have enough money. After josh told his troubles to sam slick, sam said,"I can fix that. see that fence? each time you ju
Factor the expression. If the expression cannot be factored, say so.
A blue rope is 3 times the length as a red rope. A green rope is 5 times as log as the blue rope of the total length of all 3 ropes equals 508.25m what is the l
find the sum. write each mixed number in simplest form 4 7/8 + 5 1/4
A blue rope is 3 times the length as a red rope. A green rope is 5 times as log as the blue rope of the total length of all 3 ropes equals 508.25m what is the l
Thelma spent 1/6 of her weekly allowance on dog toys.  1/4 on a dog collar and 1/3 on dog food.  What fraction of her weekly allowance is left
Factor the expression. If the expression cannot be factored, say so.
What were the contributions of the Harappan civilization?
A blue rope is 3 times the length as a red rope. A green rope is 5 times as log as the blue rope of the total length of all 3 ropes equals 508.25m what is the l
Does an owl have a backbone?