a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

Which word creates the most unpleasant mood ? Uncanny , weird, strange ,eerie
What is 607 rounded to the nearest thousand?
At the same pressure, about 25 times more co2 will dissolve in plasma as o2. why does this occur?
The problem: "One week Trey rented 4 DVDs and 2 video games for $18. The next week he rented 2 DVDs and 1 video game for $9. Find the rental costs for each vide
What role did migration play in populating the united states?
What was the music in 1776?
Hazel paid $32 to have 50 reports printed she then paid $57 to have 100 reports printed the relationship is linear what is the equation with the relationship be
A mole of X reacts at a constant pressure of 43.0 atm via the reaction X(g)+4Y(g)→2Z(g), ΔH∘=−75.0 kJ Before the reaction, the volume of the gaseous mixtur
Please helpEcologists study how relationships between biotic and abiotic factors impact the many levels of organization on earth. What level of organization is
how much simple interest will be due on a loan of 9,000 at a 4.25% annual interest rate for one year?