Chan592 Chan592
  • 03-02-2019
  • Physics
contestada

Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

Why do automobiles rust more easily in wet climates than drier climates?
Find the sum of 2/9+1/9?
is 10 yards less than 360 inches
Who was Canada's FIRST prime minister.
Scientists divide rocks into groups based on_________
How do you find the interior angles of a triangle, if only one is given angle is given to you?
Give 3 examples to show work being done.
what was the first industry to be regulated by the united states goverment?                                               a. oil   b.meat packing  c. steel  D.
The ratio of Sam age to Hanks is 5 to 3. If the sum of their ages is 24, how old is Hank?
Nick bought a video game for $55, which was 20% off the original price. what was the original price?