m5arisehsaraGe
m5arisehsaraGe m5arisehsaraGe
  • 03-05-2016
  • Physics
contestada

How much total work is done by the force in lifting the elevator from 0.0 m to 9.0 m?

Respuesta :

AL2006
AL2006 AL2006
  • 03-05-2016
The total work is

         (mass of the elevator, kg) x (9.8 m/s²) x (9.0 m)           Joules .
Answer Link

Otras preguntas

When are PACs prohibited from making contributions to members of the Texas state legislature?
1. Jada measured the height of a plant in a science experiment and finds that, to the 1/4 nearest of an inch, it is 3/4 inches.a. What is the largest the actual
Why was Congress unable to enforce the Treaty of Paris or respond to Spain closing the Mississippi River?
help: A train travels with a speed of 124 miles per hour. How much time would it take the train to travel 186 miles?
409 divided by 2 = a 24 R1 B 25 r1 C 204 R1 d 205 r1
In his February 1839 summary of Chinese thinking to British readers, Chinese Commissioner Lin argued that Britain should end its opium trade in China on the bas
Two airplanes leave the same airport. One heads north, and the other heads east. After some time, the northbound airplane has traveled 24 kilometers. If the two
Modify the function to return true if the given decimal is even when it is rounded to the nearest integer, and false otherwise 1 function isRoundedNumberEven(de
409 divided by 2 = a 24 R1 B 25 r1 C 204 R1 d 205 r1
Using percentages or ratios based upon unforeseen differentials in prices, Forward Pricing Rates Agreements (FPRAs) protect the contractors by allowing an extra