Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

P = W/t solve for W?
The ruler who showed the jews great favor was:
7.4p - 9.2p = -2.6 + 5.3
The midpoint of a segment is (6,−4) and one endpoint is (13,−2). find the coordinates of the other endpoint.
5. In order to become a better writer, you must read A. only nonfiction. B. anything except magazines. C. only novels. D. good writing.
Why do you think a federal system replaced the confederal form of government that was first tried in the United States
You have an orange liquid and told to describe it's properties. What methods would you use to observe, measure, and described the physical properties
What document established a frame of government for settlers in the plymouth colony?
How do I solve this?
A 30-year-old client whose mother died of breast cancer at age 44 and whose sister has ovarian cancer, is concerned about developing cancer. as a member of the