brainykidd2476 brainykidd2476
  • 04-09-2019
  • Social Studies
contestada

Control that focuses on the use of information about previous results to correct deviations from the acceptable standard is referred to as:

Respuesta :

aristeus aristeus
  • 16-09-2019

Answer:

Feedback

Explanation:

Feedback is a process in which we get information related to previous task which we had done.

Feedback can be very good and it can also be bad if feed is bad about any previous task which we have done then we have to improve that from feedback we learn about our weakness.

If feedback is very good then we should maintain that.

Answer Link

Otras preguntas

Anong pangyayari sa ikalawang digmaang pandaigdig
" SIMPLE PRESENT AND CONTINUOUS PRESENT"John. (train) The boys' football team every Monday, but this week he. (tra
Find the best way to fix this grammatically incorrect sentence: “In the nursery. After the spring rain. Smelled clean.” A. In the nursery, after the spring rain
7. If a load of 300N is pulled along the inclined plane shown in the figure, answer the following. B 200 N 0.5m 2m 300 N А i. Calculate the VR and MA of the inc
write a letter which ends all of the sudden the thief entered the store​
DE is tangent to Circle C at point D. What is the measure of Enter your answer in the box.
Jen recently rode her bicycle to visit her friend who lives 6 miles away. On her way there, her average speed was & miles per hour faster than on her way h
Can someone help i don’t know this
shall we read all the books in passive voice​
if 3/4 of a number is added to 5/4 it gives the same result as taking 7/8 of the number from 20 ⅓. Find the number​