​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

find the factor of 14
6 tractors take 6 days to collect the harvest how long would it take 9 tractors to do the same work
it says require your homework
which number rounds to 340 when rounded to the nearest ten?
The ........ of a wave is the number of wavelengths that pass a fixed point in a second.
1 hay ( ) desimas en 1.5 2 hay ( ) veses 12.4
prefix of spectacles
In a paragraph, describe the differences between external and internal radiation therapy. (Site 2)
3|x| 5=8 solve the problem
Usually the flood season produced a "good Nile, “just the right amount of water. What might be the consequences of a "bad Nile"- too much or too little water?