​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

48 successful students is 80% of what number of students?
A 12 foot ladder is leaning against a building . The ladder makes a 45 degree angle with the building . How far up the building does the ladder reach ?
Does the equation 2x-4y=0 represent a direct variation
Review the noble gases in the periodic table. As molar mass increases, the number of electrons increases, resulting in more dipole-dipole interactions. greater
3. Railroads encouraged the growth of settlements in the West because they A. made it easier to move products from the interior of the country to the ci
How does the House of Representatives determine the rules of proceedings (the ability to have debates, amendments, etc.)?
13°38'35" to decimal degrees
hot coffee in a mug cools over time and the mug warms up . which describes the energy in the system
What is the difference between –4 and 6?
What does the term popular sovereignty mean?