True or False: Changing a bid package's status to "Closed" removed it from the bidder's Planroom and the bidder will no longer be able to submit bids.

Respuesta :

kendrich
kendrich kendrich
  • 07-03-2020

Answer:

True

Explanation:

It's actually true because once a bidding page status changes to closed, it means that the timeframe for bidding has stopped, hence, no bidder will be able to bid again.

Answer Link

Otras preguntas

I am so confused about this graphing problem, just need answer doesn't have to show workRectangle ABCD has a length of 9 and a width of 7. Point D is the ordere
Solve: K= 2(11 - k) + 14
Water Cycle: As _________ get too heavy to hold the liquid, the liquid droplets fall back to Earth.
What was significant about the new habitats Darwin visited?
what is the ordered pair solution for;x + 2y = 53x - y = 1
Force and Motions: Pushes and pulls of all kinds are________.
Which of the following occurs during anaphase I of meiosis? (A) Formation of tetrads (B) Separation of homologous chromosomes (C) Crossing over (D) Separation o
What holds calcium chloride together? A. hydrogen bonding B. metallic bonding C. ionic bonding D. dipole forces E. van der Waals forces (London dispersion force
what is the difference between a pentagonal prism and a pentagonal pyramid???????????
What does ¿Cuál es la fecha de mañana? mean and how would you reply?