bluebutterfly2877
bluebutterfly2877 bluebutterfly2877
  • 01-11-2020
  • Mathematics
contestada

240 examiners can complete the
correction work in 8 days. If the work has
to be completed in 6 days, how many
more examiners should be employed?​

Respuesta :

balkrishnapradhan947
balkrishnapradhan947 balkrishnapradhan947
  • 01-11-2020

40 more examiners.....

Answer Link
juraijsaeed
juraijsaeed juraijsaeed
  • 01-11-2020

Answer:

240 x 8 = 1920

1920 / 6 = 340

340 examiners can complete work in 6 days

Answer Link

Otras preguntas

What is the value of x? A right triangle with a short leg measuring 5, a long leg measuring 5, and the hypotenuse as x.A. 10 B. 5C. [tex] 2\sqrt5 [/tex]D. [tex
A 36-tooth gear turns three times. It is connected to a 12-tooth gear. How many times does the 12-tooth gear turn?
1.How and why did the universe begin?2.Whats the point of life? Why are we here?3.Are we alone in the universe?4.Are moral values relative or absolute?5.Should
a bottle contains 12 red marbles and 8 blue marbles. A marble is chosen at random and not replaced. Then a second marble is chosen at random. Determine the prob
Who were the 'KKK' and what were there intentions? (Teacher didn't tell me)
11. Consider the elements neon, bromine, and phosphorus. Which has five electrons in its 4p sublevel?
8k-1=15 ? Help I have a question were we have to work this out what do I do?
i need a diagram for how a scrap heap magnet works
If a car can go from 0 to 60 mi/hr in 8.0 seconds, what would be its final speed after 5.0 seconds if its starting speed were 50 mi/hr?
Identify true statements. (a) A sequence is either arithmetic or geometric. (b) An arithmetic sequence is either increasing or decreasing if common difference i