florenciaaxell7382 florenciaaxell7382
  • 01-01-2021
  • Computers and Technology
contestada

When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

X-3+7 (x+3) -3x-12 how do you solve it
A drug that blocks the action of carbonic anhydrase in parietal cells would result in
If x -9 is a factor of x^2 -5x-36 , what is the other factor ?
A cardboard box without a lid is to have a volume of 23,328 cm3. Find the dimensions that minimize the amount of cardboard used. (Let x, y, and z be the dimensi
Which of the following is not a subject? A. My friend B. Yesterday C. His dog D. Around the house
An envelope is classified as a large envelope if the length exceeds 11.5 inches . What is the length of the envelope shown? Round to the nearest tenth
What's the answer to this equation 5/3×(-6/7)
What is the attribute being measured? A) ages B) years C) family reunion D) number of people
Are the pronouns in this sentence used correctly? • Carlos told Luis that he would have a hard time finding the place. O No, the pronoun he doesn't have a clear
“Dr. King was a uniter, not a divider." Do you agree with this statement? Explain your answer.