medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

A sample was prepared by mixing 18. ml of 3.00 x 10^-3 m crystal violet (cv) with 2.00 ml of 0.250 m naoh. calculate the resulting concerntattions of cv and oh-
Limestone and concentrated h2so4 are reacted togethe
Write a real-world problem that could be represented by the following equation. 30 + 0.05x = 40 + 0.01x
the diagram above shows a basic double helix structure of human DNAwhich best describes the function of adenine, thymine, guanine, and cytosine?A: To act as the
Stephanie puts 30 cubes in a box. the cubes are 1/ inch on each side. the box holds two layers with 15 cubes in each layer. what is the volume of the box
necesito un parrafo pequeño donde tenga palabras mal escritas
which type of case would be likely be heard in federal court?
A Chinese farmer living during the early tang dynasty can expect to experience which of the following changes
(consider this) suppose that a large tree on betty's property is blocking chuck's view of the lake below. betty accepts chuck's offer to pay betty $100 for the
Your summer vacation was perhaps not an overwhelmingly positive event, but during the finals week of august, you remember it as being a fantastic time. this is