medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

simplify p8/p2can you help me with this question...anyonnnneee...????
solve the formula for the indicated variable (b=rw+r,for w  sollution w=____)
Which is the correct solution set for 4x^2 +4x -3 = 0? (1) {2,-3}(2) {1/2, -3} (3) {1,2}(4) {1/2, -3/2}
isabella has found that she stays the most fit by running variouse dinstances and terrains through out the week. On mondays she runs 2.5 miles, on tuesdays 4.6
The sum of two numbers is 44.The larger number is 20 more than the smaller number. What are the numbers?
What is an object with a very high resistance classified as?
isabella has found that she stays the most fit by running variouse dinstances and terrains through out the week. On mondays she runs 2.5 miles, on tuesdays 4.6
what is air pressure?
What are some behavioral adaptations for a porcupines?
Which Property of Equality should be used first to solve the equation p/7 - 5 = -3 for p Addition Property of Equality Subtraction Property of Equality Multipli