ishamahmood22 ishamahmood22
  • 04-02-2021
  • Mathematics
contestada

if it takes 4 workers 6 hours to paint a fence, how long would it take 8 workers

Respuesta :

tristonanderson38
tristonanderson38 tristonanderson38
  • 04-02-2021

Answer:

3 workers

Step-by-step explanation:

just divide by 2

Answer Link
snuddy0809
snuddy0809 snuddy0809
  • 04-02-2021
It would take 8 workers 3 hours
Answer Link

Otras preguntas

what does this mean on a tamagotchi lol (this is the hello kitty one)
Helppp the tutorsss arent workinggg
A car park has 20 vehicles 12 of them are cars.what fraction of the vehicles are cars?​
Triangle PQR has vertices P(−3,4), Q(−8,3), and R(−1,−6). Triangle PQR is dilated by a scale factor of 8 centered at the origin to get triangle P′Q′R′. What are
A bag contains 96 marbles, some red and some green. The ratio of red marbles to green ones is 2:4. How many green marbles are there?
answer for brainilest and 11 points
Caterers made 272 cups of punch for a party. They will distribute the punch equally into 6 bowls. How many cups of punch will each bowl have? A. B. C. D.
Use a+= then find the perimeter A rectangle with a length of 15 feet has a diagonal that measures 17 feet. Find the perimeter of the rectangle. A. 46 feet B. 32
The square of a negative integer has the same value as the sum of that integer plus 2. what is the integer?
20 POINTS! RIGHT ANSWER GETS BRAINLIST Read this passage. Some people think of Ben Franklin primarily as a statesman and diplomat. Others consider him to be, fi