estefaniasierra0620 estefaniasierra0620
  • 01-10-2021
  • Health
contestada

How much it would cost a company if a worker is paid $8.00 an hour works five days a week and comes in 15 minutes late each day

How much it would cost a company if a worker is paid 800 an hour works five days a week and comes in 15 minutes late each day class=

Respuesta :

jadeybakey
jadeybakey jadeybakey
  • 01-10-2021
I think it would cost them 10.00.
Answer Link

Otras preguntas

The Eastern Alberta DC Transmission Line is a project that began construction in 2012. It includes a 500km, 500kV power line from the Brooks area to the Edmonto
What is the approximate area of the shaded region?
A 2.00−L sample of water contains 150.0 μg of lead. Calculate the concentration of lead in ppm.
These tables represent an exponential function.Find the average rate of change for the interval from x=7 to x=8
Certain preparations contain killed or weakened live biological agents that, upon injection into our body, protect the body against those pathogens. What are th
What is Iran doing to cause Donald trump to threaten there country on Twitter
What makes radioisotopes useful for dating objects answers?
When the burner in a hot air balloon is turned on, the temperature of the air in the balloon ________ causing its volume to _________ and the balloon _________.
HELP ME PLZ ASP!! There are two factories in the town of Lemming. Factory A has 4 times as many workers as Factory B. Factory A has 1,160 workers. How many wo
Which trace fossils are created when a worm travels through the soil and the impression is filled with hardened sediment?a.coprolitesb.tracks and trailsc.molds