Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Donna makes a round pizza. She wants to put a cheese layer on the pizza. If the cake is 8 cm in diameter, how many square cm of cheese layer does she need to pu
The normal boiling point corresponds to the temperature at which both the liquid and gas are under the standard atmospheric pressure of 1 atm. TRUE FALSE
Which of the following is true of Clydesdale and Thoroughbred horses? A.They are the same species and have different traits. B.They are different species and h
Calculate the area of the following figure correct to 2 decimal places if can show or explain work
Tom,Scott and dawn sold cookies at the school fair. Tom had 90 cookies and sold 60% of them. Scott had 150 cookies and sold 2/3 of them. Dawn sold 46 cookies. W
In scientific terms, how is power related to work? A.Power is the ability to do work. B.Power is the force of work over a certain distance. C.Power is the rate
What is an anemometer used to measure?
if x2+2=6x is solved by completing the square, an intermediate step would be
what does abrrevation mean
Ana buys a sweater for $25.60, and it is on sale for 35% off. What is the amount of the discount?