hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

In the distant future, companies will be using technology that can replicate food. what will happen to the equilibrium wage and quantity of cooks
Madison Wisconsin is northwest of Chicago Illinois. This is an example of which geographic concept?
What is Hawthorne's overall message about the nature of man? A. All people are born pure, but then they choose to be evil. B. All people have it in their hear
Which type of medicine kills disease causing bacteria to prevent infection but also kills The good bacteria that your body needs?
What was significant about the election of 1828
The purpose of the petition sent to King George III by the First Continental Congress was to
A ball with an initial velocity of 8.00 m/s rolls up a hill without slipping. treating the ball as a spherical shell, calculate the vertical height it reaches.
Which statement from Governor George Wallace's inaugural address best supports his claim that the South will always embrace racial separation?
What is the boiling point of a 0.321m aqueous solution of nacI
In a _____, if any link between nodes is severed, the entire network is affected, and failure of a single node disrupts the entire network.