A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Suppose two children push horizontally, but in exactly opposite directions, on a third child in a wagon. The first child exerts a force of 75.0 N, the second a
Help to be marked as brainliest
Tammy wants to attend a concert of her favorite duo, Queen Tunius and the Jake-man. Unfortunately, she does not have a ticket. She has decided to sneak in to th
Where it is located and a general description on the area Why it's such a popular destination Describe two positive and two negative impacts that mass tourism h
An engineer working in an electronics lab connects a parallel-plate capacitor to a battery, so that the potential difference between the plates is 240 V. Assume
ANSWER THEM ALL CORRECTLY PLEASE! 20 POINTS! Kellie and her sister Ashley are training for a race. Kellie ran 8 miles in 72 minutes. Ashley ran 12 miles in 10
Suppose that you are trying to decide whether to buy tomatoes or cucumbers in a grocery store. You think about the wide variety of recipes that use tomatoes, co
THE United States owned about 16 trillion in debit the interest rate on the national debit is about 1% per year. how much interest does the United States pay ea
Consider the animation code from the end of Chapter 4. Modify the ShapeIcon class so that it aggregates a collection of objects implementing the MovableShape in
sin 80 nearest four decimal