It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

The last of Wilson's Fourteen Points called for
how do i change a trapezoid into a rectangle
a bicycle wheel travels about 82 inches in 1 full rotation. What is the diameter of the wheel, to the nearest inch? (use 3.14 for pi)
A swimming pool  20 m long and 10 m wide is surrounded by a deck of uniform width. The total area of the swimming pool and the deck is 704 m^2. Find the width o
Name two things found in a plant cell that are not found in an animal cell.
The edge of one cube is 4 m shorter than the edge of a second cube. The volumes of the two cubes differ by 1216 m^3. Find the edge of the smaller cube.
How to convert 0.39 into a fraction?
Explain why shorelines are always changing
How much energy is contained in the mass of a 60-kilogram person?
Why were the steel plow in the mechanical Reaper important inventions?