Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

During convection, hot material then moves to the side and . This circular pattern is called a convection current.
What is NOT a possible result for both high protein diets and high carbohydrate diets? A. constipation B. ketone buildup C. muscle loss D. weight gain
Which list of decimal numbers is written in descending order? A. 3.199, 3.456, 4.001, 4.05, 4.00099 B. 4.00099, 4.001, 4.05, 3.199, 3.456 C. 4.05, 4.001, 4.0009
The first Americans were
(06.05) High school students from grades 9–10 and 11–12 were asked to choose the kind of band to have play at a school dance: rap, rock, or country. Their choi
studying mathematics in the night is better than the morning study and why? give me your opinion please share it with me i'm thinking to study math at night but
what does exlamitory mean
Which of the following is malleable A. Glass B. Pottery C. Ice D. Gold
How does diction affect setting?
Coin and paper money is called: A. currency B. temporary money C. the dollar D. commodity money