jreedy4403 jreedy4403
  • 02-08-2019
  • Computers and Technology
contestada

In planning for disaster recovery, what is the ultimate goal?

Respuesta :

bbb99
bbb99 bbb99
  • 04-08-2019
Be able to get the systems fully operational with minimum downtime. That means having parallel backups of data but also systems that can be bored up often at a different location
Answer Link

Otras preguntas

The store,s rectangular floor is 42 meters long and 39 meters wide. How many square meters of flooring do they need? Use estimation to assess the reasonableness
A solid substance was tested in the laboratory. The test results are listed below. • dissolves in water • is an electrolyte • melts at a high temperature Based
What medium is most effective for a school play advertisement? A. a flyer posted around school B. an ad in the newspaper C. an ad on the Internet D. an ad on te
Which of the following climates is most suited for physical weathering? A. Warm B. Cool C. Dry D. Hot
The circuit court is also known as the court of appeals. a. True b. False
2x-3=7 Possible answers: 2 5 8
Simplify the following algebraic expressions: -2(x-2b+1/2) Possible answers: A) 2x-4b+1 B) 2x+4b-1 C) -2x-4b-1 D) -2x+4b-1
What is 6 to the tenth power
What was the Atlantic Charter? A. an agreement made at the Yalta Conference between Roosevelt, Churchill and Stalin to divide up Germany after the war B. an ag
True or false Japan experienced outstanding economic growth during the 1970s and 1980s.