Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

To Kill A Mockingbird Describe the outward pressures on Scout to “become a lady.” Do you think Atticus applies the same pressures? Why, or why not? Why do you t
which factors do 25x^2+40x+16 and 25x^2-16 have in common?
A newborn infant usually triples its birth weight by age one year. Baby carter weighed 28 pounds on his first birthday. If this were triple his birth weight (b)
I'm not sure on how to do this problem may someone please help and explain this to me? Thanks in advance :)
how are monomers and polymers related?
Name the properties that were used to derive the properties of logarithms.
A small plane is 4 miles by land away from the airport. The angle of elevation from the airport to the airplane is 6.5° What is the altitude of the plane? Rou
Bob Woodward and Carl Bernstein did not get the support of their newspaper, the Washington Post, and were fired for their investigative reporting. True or False
The expansion of communism into the Eastern Europe was a direct result of 1) the Crimean War 2) the Napoleonic War 3) World War 1 4) World War 2
for 10 points give me the right answer