The Engineer of Record may exercise control over a project by means of electronic communication devices.a. Trueb. False

Respuesta :

onyebuchinnaji
onyebuchinnaji onyebuchinnaji
  • 05-01-2020

Answer:

False

Explanation:

The Engineer of Record for all projects shall be a registered Professional Engineer (P.E.)

Some Detailed Responsibilities of Engineer of Record

The Engineer of record shall attend

  1. Pre-Construction Conferences,
  2. Pressure Tests,
  3. Lift Station Start-ups,
  4. Pre-Final Walk-through and
  5. Final Inspections, etc.

All these responsibilties require his physical presence which cannot be achieved through electronic communication.

Answer Link

Otras preguntas

the most important thing in demonstrative theorem is?​
Letter to Russian War Minister Alexander Kerensky from soldiers fighting in WW1, August 18th, 1917. Mr. War Misiter! We, soldiers from various regiments[...] as
where was first place landed Adam and Eve or Hawa? ​
What did Democrats indicate was the greatest threat to American nationalism?
order from least to greatest? please​
Start with x^2 + 4x = 12 and complete the square, what is the equivalent equation? A) (x + 2)^2 = 16 B) (x + 2)^2 = 14 C) (x + 4)^2 = 16 D) (x + 4)^2 = 28
Match the stem and leaf plot to the correct set of data.
solve the equation and state a reason for each step 5(3y+2)=25
____ currents flow from the equator to the poles A. Surface B. Warm-water C. Cold-water D. Longshore
Rachel wants to replace the wooden floor at her gym. The floor is in the shape of a rectangle. Its length is 45 feet and its width is 35 feet. Suppose wood floo