katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

3 contributing factors that led to xenophobia​
You get into an elevator and step onto a bathroom scale, which shows you weigh 150 pounds. The doors close, and the elevator starts to move, very smoothly. You
The linear probability model is: the application of the multiple regression model with a continuous left-hand side variable and a binary variable as at least on
mga bansang may pagkakatulad sa panitikan sa pilipinas
Please help me! with this!
Please help me and if you can, could you please explain. Thank you :D
Rachel wants to make sure that she uses effective communication skills at work. Which of the following is an example of something she shouldn't do? When giving
Most children received which vaccine at school during the 1950s? A. chicken pox B. cholera C. malaria D. polio
It takes 0.750.75 cups of sugar to make a batch of lemon cookies. I have 5.55.5 cups of sugar. How many batches can I make?
Pythagorean theorem please show work thank you