samsam835 samsam835
  • 03-05-2020
  • Mathematics
contestada

bill can paint a room in 6 hours, but bills father could do it in four. if the two work together, how long would it take them to do the job?

Respuesta :

astridarmenia
astridarmenia astridarmenia
  • 03-05-2020

Answer:

3 hrs thats my anwser

Step-by-step explanation:

brainliest if right

Answer Link

Otras preguntas

d. 2 5. How many moles of HCl are needed to produce 25 moles of KCl in the presence of excess potassium permanganate? a. 16 b. 32 c. 5 d. 200​
Help me plllsssss quick
A runner of 60kg accelerates at 2.0 m/s at the start of race calculate the force provided from her legs
Name the compound of calcium used for disinfecting water. Give its chemical formula.​
does a 21.6v battery work with a 24 volt controller
Looking at the chemical formulae of these compounds, which is an alkane? * 1 point C3H8 C2H4 C2H5OH C5H10
Please help fast I have a exam
Why is the population density lower in northern Mexico than southern Mexico? A Much of northern Mexico is covered by dense, humid rain forest protected by the
# of justices needed to hear a brief
Make x the subject of m=n +x/p​