hamsterhannah2700 hamsterhannah2700
  • 04-06-2020
  • Mathematics
contestada

A plumber laying 500meters of drain pipe requires 20men working for 10days. What length in meters would be laid by 50men in 5days, if they all work at same rate?

Respuesta :

onyebuchinnaji
onyebuchinnaji onyebuchinnaji
  • 06-06-2020

Answer:

50men working in 5days will lay 100 meters

Step-by-step explanation:

If 20men working for 10days lays 500meters

then, 1 man will lay 10,000 meters in 10 days

also, 1 man will lay 1000 meters in 1 day

If 1 man lays 1000 meters in 1 day,

Then, 50 men will lay (1000 meters / 50 );  20 meters in 1 day

also, the same 50 men will lay (20 meters x 5days); 100 meters in 5 days.

Therefore, 50men working in 5days will lay 100 meters

Answer Link

Otras preguntas

Hey, need some help reverent A. respectful B. respect C. reply D. to spoil
An object with mass 60 kg moved in outer space. When it was at location < 13, -19, -3 > its speed was 3.5 m/s. A single constant force < 220, 320, -120
What is the probability of someone correctly guessing your Social Security number? (Assume all digits 0-9 are available for use)a
what is force ?is it desirable or undesirable?
What are the operation sines that make this statement correct? 3_5_7_18_3=14
which foods earthworms can digest?
When MgCO3(s) is strongly heated, it produces solid MgO as gaseous CO2 is driven off.Does the oxidation number of carbon change upon the formation of CO2?
When MgCO3(s) is strongly heated, it produces solid MgO as gaseous CO2 is driven off.Does the oxidation number of carbon change upon the formation of CO2?
what does como eres tu mean in spanish?
which type of gas is filled in lays pack and why?