sr9376328
sr9376328 sr9376328
  • 02-12-2020
  • Mathematics
contestada

men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

A bird flies 2.8 due west and then 2.7 due north. Another bird flies 2.7 due west and 2.8 due north. What is the angle between the net displacement vectors for
Which compound is classified as a hydrocarbon? (1) butanal (3) 2-butanol (2) butyne (4) 2-butanone
Which property is a measure of the average kinetic energy of the particles in a sample or matter? (1) mass (2) density (3) pressure (4) temperatu
Why do some states have more Representatives than other states?
whats the y intercept of y= 1/2 log(x+1)-log(2x+10)
In terms of entropy and energy, systems in nature tend to undergo changes toward (1 ) lower entropy and lower energy (2) lower entropy and higher energy (3) hig
What is the supreme law of the land?
the band members sold 316 juice drinks for a fundraiser. they sold 52 more grape drinks than strawberry drinks. how many of each type of juice drink did they se
Which compound yields H + ions as the only positive ions in an aqueous solution? (1) KOH (3) CH3OH (2) NaOH (4) CH3COOH
Who is the Commander in Chief of the military?