Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

Which of the following statements is false? A rational number cannot be an irrational number. An irrational number is always a real number. An integer
Can anyone help with this I’ll mark brainliest!!!
You are a reporter sent to cover the march on Washington in 1963 watch footage of the March and listen to Martin Luther King Junior’s I have a Dream sweet use w
the president fills several different roles simultaneously. analyze how the roles of chief of state, chief diplomat, and commander in chief are related.
Scientist assist rocks into three different types what is the main basis for the classification system they choose? A. Color B. Shape of rock C. How it formed
Ornamentation was not originally intended to _____ . show off a musician's technical skills embellish a repeated passage provide added interest for the listener
Can someone answer this fast?The determinant of matrix A is shown below.
This poem deals with the same story mentioned in the lecture. Discuss what is lost and/or gained by presenting it in this genre instead of as prose."Persephone"
find the area of the triangle 9yd 3yd 8 yd
How does a comet’s tail form? 20 points pleas