karlrey2763 karlrey2763
  • 04-05-2021
  • Physics
contestada

Calculate the work done if a boy lifts a bag of cement 500N to the floor of a lorry 2.5m above the ground

Respuesta :

hamzaahmeds
hamzaahmeds hamzaahmeds
  • 05-05-2021

Answer:

W = 1250 J = 1.25 KJ

Explanation:

The work done by the boy is due to the change in the position of the cement vertically. Hence, the work done in this case will be equal to the potential energy of the cement:

[tex]W = P.E\\W = mgh[/tex]

where,

W = Work done = ?

mg = W = weight of cement = 500 N

h = height covered = 2.5 m

Therefore,

[tex]W = (500\ N)(2.5\ m)[/tex]

W = 1250 J = 1.25 KJ

Answer Link

Otras preguntas

The mid point between T(-2,6) and J (-5,1)
Find the slope of the line that passes through (7,10) and (4,11)
Tell weather the ratios form proportion 3/11 and 17/6True or False
Can you helpMe with this Equation:y = - 2x-+ 3
Meanwhile I will post the next question: A woman with blood type A and a man with blood type B have 3 children one each with blood types A,B and O . What are t
Answer the statistical measures and create a box and whiskers plot for the followingset of data.4,4,5,5,5,6,6, 8, 9, 10, 12, 14, 14, 15, 17
LEVEL B 1.b) Solve for x angle relationship X+34" 2x-120
Create a model of the atoms of a substance moving through the solid, liquid, and gas states. This can be a physical model using household or crafting items or a
QUESTION IS IN IMAGE!! DONT SHOW WORK JUST THE ANSWER UNLESS YOU NEED TO
1) Find the equation of the line through the points (-2, 5) and (3, 1). Also, graph this line.