khloesmith14 khloesmith14
  • 03-03-2022
  • Mathematics
contestada

A group of workers can plant 81 acres in 9 days. What is their rate in acres per day?

Respuesta :

lilswooosh082110 lilswooosh082110
  • 03-03-2022

Answer: 9 acres.

Step-by-step explanation:

9 times 9 in 81 easy math. hope this helps :)

Answer Link

Otras preguntas

How does this passage show a change in Macbeth’s relationship with banquet?
After the optimism of the Renaissance, neoclassical writers strived for structure, order, and balance. The cultural trend changed from the belief that people we
Bill is interested in becoming a professional dancer. Why would going to college be a part of his career plan? A. to ensure a career in dancing B. to dissuade
Solve for z : 4z-6/4=3z+1
NaCl is common table salt and is an ionic compound. Table salt can be stirred into water to create a salt-water solution. What happens to the solubility of sod
an 18% tip was left on a $26 lunch bill how much was the tip?
Which part of this sentence is notcorrect?Estas muchachos altos son los hermanos de Rosa. A. altos B. muchachos   C. Estas   D. los
In wild, tigers eat all parts of their prey.Including bones.In zoos they develop bone problems when they are fed only flesh? Why?
The bond between two oxygen atoms (a molecule of oxygen air) has two characteristics. What are they? A.Valence electrons are shared between oxygen atoms. B.A do
Simplify the algebraic expression: 14xy + xy – 4yx + yx