mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

Seamstress Jane has purchased 50 yards of red fabric and 110 yards of gold fabric to make red and gold curtains. What is the largest number of curtains she can
ayooo plz help me w dis!!!
Use the Born-Haber cycle to calculate the lattice energy of NaF. (Hsub for sodium is 107.5 kJ/mol, IE1 for sodium is 496 kJ/mol, EA1 for fluorine is 328 kJ/mol,
Please help me with this question it is difficult for me!! Explain, with examples, the impact of the continual re-use of materials in nature. NB: the role of de
What is the factored form of the binomial expansion 125x^3 + 525x^2 + 735x + 343?
Identify 3 distractions for young drivers and explain how you plan to minimize these distractions
Find the least perfect square, which is divisible by each of 22, 36 and 66.​
What is the length of AC?
La Sra. Estela Smith y el Sr. Alonso son maestros agradables. Los lunes y los miércoles tienen clases llenos de estudiantes ocupados. Los maestros son cuidadoso
How do residential and outpatient rehab programs compare?