ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

The nucleus of one boron atom has five protons and four neutrons. Determine the total number of electrons in the boron atom.
Molecules of 1-bromopropane and 2-bromopropane differ in (1) molecular formula(2) structural formula(3) number of carbon atoms per molecule(4) number of bromine
what is 245.3 divided by 5=?
Nuclear fusion differs from nuclear fission because nuclear fusion reactions (1) form heavier isotopes from lighter isotopes (2) form lighter isotopes from heav
What is the total number of electrons shared in a double covalent bond between two atoms? (1) 1 (3) 8 (2) 2 (4) 4
is 5.1 greater than 5.01
In which solution will thymol blue indicator appear blue? (1) 0.1 M CH3COOH (3) 0.1 M HCl (2) 0.1 M KOH (4) 0.1 M H2SO4
What was the Mayflower Compact? the ship that transported the Pilgrims to America the colonial legislature of Virginia the agreement in which the Pilgrims agree
Given the equation: HCl(g) + H2O(l)--> X(aq) + Cl--(aq) Which ion is represented by X? (1) hydroxide (3) hypochlorite (2) hydronium (4) perchlorate
What is the total number of oxygen atoms in the formula MgSO4•7H2O? [The • represents seven units of H2O attached to one unit of MgSO4.] (1) 11 (3) 5 (2) 7 (4)