cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

Makayla was training for a 2k run. it was tiring, and she had to stop and walk to the finish line.if she had run 650 meters out of each kilometer, how many k
Your views on world war 1/2 -asl speech
help me please thanks
Explain how scientific investigations that preceded lamarck contribution to the development of his theory of evolution?
Which of the following structures collects the depolarization wave from the atria to pass it onto the ventricles?
The yearbook club is having a bake sale to raise money for the senior class. Large cupcakes are sold for $1.25 each and small cupcakes are sold for $0.75 each.
Which structure-function pair is mismatched??
MB= 8x + 7 AB= 126 solve for x
What fraction is 5 out of 22
Ron makes $2,980 a month. What is the maximum monthly rent he can afford? $655.60 $745 $834.40 $774.80