boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

what is meant by a hoary corpse?
What was one of the success achieved by Granges
five digt number divisible by 4 and 6
Which of these is a physical property? a. conducts electricity poorly b. easy to digest c. does not burn d. becomes moldy quickly
whats 0.362 in expanded form
What is 4 1/3 minus 2 3/4
What is the answer to 6[3+7(4-2)]
What's the anewer to this problem..? 21×__=9×21 tell which property you used 21×=9×21 Property of multiplication..
What does ¿El Día de San Valentín es el trece de enero? mean?
you are traveling down the interstate averaging 50 MPH. How much has passed when you have traveled 120 miles?